Integration New Tripods Cells C4L7-C4R7 JP.Corso le 7/05/2007

Modele 3D Euclid :L0332414VU

Four locations were asked to be added in LSS7 to complete Survey Network.

Following image shows in white existing GGPSO in the Tunnel, and in yellow the DCUMs proposed by TS-SU.

After checking, the 2 'central' locations are moved by 4 m backwards from IP7. Both tripods will have to be positionned radially 300mm from medium beam axis.